Ohio EPA Division of Drinking and Ground Waters

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OH2504412 Federal Type : C
Water System Name : COLUMBUS PUBLIC WATER SYSTEM State Type : C
Principal County Served : FRANKLIN Primary Source : SW
Status : A Activity Date : 10-01-1944

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
330 RT MN 05-01-2022 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
2554077 COLUMBUS HAP CREMEAN WTP 0100 TURBIDITY 31 6 01-01-2005 95PT
2554077 COLUMBUS HAP CREMEAN WTP 0999 CHLORINE 31 6 01-01-2005 EPRD
2554077 COLUMBUS HAP CREMEAN WTP 0100 TURBIDITY 31 6 01-01-2005 MAXT
2554076 COLUMBUS DUBLIN ROAD WTP 0100 TURBIDITY 31 6 01-01-2005 95PT
2554076 COLUMBUS DUBLIN ROAD WTP 0100 TURBIDITY 31 6 01-01-2005 MAXT
2554076 COLUMBUS DUBLIN ROAD WTP 0999 CHLORINE 31 6 01-01-2005 EPRD
2554078 COLUMBUS PARSONS AVE WTP 1925 PH 2 0 07-14-1998
2554076 COLUMBUS DUBLIN ROAD WTP 1925 PH 2 0 07-14-1998
2554077 COLUMBUS HAP CREMEAN WTP 1925 PH 2 0 07-14-1998
DS1 COLUMBUS PWS DISTRIBUTION 1044 ORTHOPHOSPHATE 2 0 07-01-1998
Total Number of Schedules Displayed = 10

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
2554076 COLUMBUS DUBLIN ROAD WTP CI12 CDS FOR ALL 12 IOC 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
2554076 COLUMBUS DUBLIN ROAD WTP CBRO CDS FOR BROMATE 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
2554076 COLUMBUS DUBLIN ROAD WTP CYSC CDS FOR CYSC 1 RT 2W 03-30-2025 to 04-12-2025 04-13-2025 to 04-26-2025
2554076 COLUMBUS DUBLIN ROAD WTP CSO1 CDS FOR GROUP 1 SOC 1 RT YR 05-01-2025 to 05-31-2025 05-01-2026 to 05-31-2026
2554076 COLUMBUS DUBLIN ROAD WTP CSO1 CDS FOR GROUP 1 SOC 1 RT YR 06-01-2025 to 06-30-2025 06-01-2026 to 06-30-2026
2554076 COLUMBUS DUBLIN ROAD WTP CSO1 CDS FOR GROUP 1 SOC 1 RT YR 04-01-2025 to 04-30-2025 04-01-2026 to 04-30-2026
2554076 COLUMBUS DUBLIN ROAD WTP CSO2 CDS FOR GROUP 2 SOC 1 RT 3Y 01-01-2025 to 12-31-2025 01-01-2028 to 12-31-2028
2554076 COLUMBUS DUBLIN ROAD WTP CSO3 CDS FOR GROUP 3 SOC 1 RT 3Y Monitoring Completed 01-01-2027 to 12-31-2027
2554076 COLUMBUS DUBLIN ROAD WTP CSO4 CDS FOR GROUP 4 SOC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2026
2554076 COLUMBUS DUBLIN ROAD WTP CRD7 CDS FOR GROUP 7 CRAD 1 RT 6Y Monitoring Completed 01-01-2026 to 12-31-2026
2554076 COLUMBUS DUBLIN ROAD WTP CMT7 CDS FOR MT70 4 RT 2W 03-30-2026 to 04-12-2026 04-13-2025 to 04-26-2025
2554076 COLUMBUS DUBLIN ROAD WTP CNO3 CDS FOR NITRATE 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
2554076 COLUMBUS DUBLIN ROAD WTP CNO2 CDS FOR NITRITE 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2029
2554076 COLUMBUS DUBLIN ROAD WTP CVOC CDS FOR VOC 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
2554077 COLUMBUS HAP CREMEAN WTP CI12 CDS FOR ALL 12 IOC 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
2554077 COLUMBUS HAP CREMEAN WTP CBRO CDS FOR BROMATE 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
2554077 COLUMBUS HAP CREMEAN WTP CYSC CDS FOR CYSC 1 RT 2W 03-30-2025 to 04-12-2025 04-13-2025 to 04-26-2025
2554077 COLUMBUS HAP CREMEAN WTP CSO1 CDS FOR GROUP 1 SOC 1 RT YR 04-01-2025 to 06-30-2025 04-01-2026 to 06-30-2026
2554077 COLUMBUS HAP CREMEAN WTP CRD7 CDS FOR GROUP 7 CRAD 1 RT 6Y Monitoring Completed 01-01-2026 to 12-31-2026
2554077 COLUMBUS HAP CREMEAN WTP CMT7 CDS FOR MT70 4 RT 2W 03-30-2026 to 04-12-2026 04-13-2025 to 04-26-2025
2554077 COLUMBUS HAP CREMEAN WTP CNO3 CDS FOR NITRATE 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
2554077 COLUMBUS HAP CREMEAN WTP CNO2 CDS FOR NITRITE 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2029
2554077 COLUMBUS HAP CREMEAN WTP CVOC CDS FOR VOC 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
2554078 COLUMBUS PARSONS AVE WTP CI12 CDS FOR ALL 12 IOC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2026
2554078 COLUMBUS PARSONS AVE WTP CSO1 CDS FOR GROUP 1 SOC 1 RT 3Y Monitoring Completed 01-01-2027 to 12-31-2027
2554078 COLUMBUS PARSONS AVE WTP CRD7 CDS FOR GROUP 7 CRAD 1 RT 6Y Monitoring Completed 01-01-2026 to 12-31-2026
2554078 COLUMBUS PARSONS AVE WTP CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
2554078 COLUMBUS PARSONS AVE WTP CNO2 CDS FOR NITRITE 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2029
2554078 COLUMBUS PARSONS AVE WTP CVOC CDS FOR VOC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2026
DS1 COLUMBUS PWS DISTRIBUTION CASB CDS FOR ASBESTOS 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2029
DS1 COLUMBUS PWS DISTRIBUTION CDBP CDS FOR DBP 16 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
DS1 COLUMBUS PWS DISTRIBUTION CL90 CDS FOR LEAD COPPER 50 RT 3Y 06-01-2026 to 09-30-2026 06-01-2029 to 09-30-2029
IN86613 INTAKE AT DUBLIN RD SCIOTO RIVER CTOA CDS FOR TOC/ALK 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
IN86618 INTAKE AT HAP CREMEAN BIG WALNUT CTOA CDS FOR TOC/ALK 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
IN86621 OUTFALL ALUM CK TO HOOVER, HAP CREMEAN CTOA CDS FOR TOC/ALK 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
IN86624 INTAKE ALUM CK TO HOOVER, HAP CREMEAN CTOA CDS FOR TOC/ALK 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
Total Number of Schedules Displayed = 36

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
2554076 COLUMBUS DUBLIN ROAD WTP 2920 CARBON, TOTAL 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
2554077 COLUMBUS HAP CREMEAN WTP 2920 CARBON, TOTAL 1 RT MN 04-01-2025 to 04-30-2025 05-01-2025 to 05-31-2025
DS1 COLUMBUS PWS DISTRIBUTION 1000 TOTAL CHLORINE 1 RT MN initialized initialized
Total Number of Schedules Displayed = 3

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
MOR01 JANUARY PLANT/DIST MOR 2010-02-10
MOR02 FEBRUARY PLANT/DIST MOR 2010-03-10
MOR03 MARCH PLANT/DIST MOR 2010-04-10
MOR04 APRIL PLANT/DIST MOR 2010-05-10
TAS01 JANUARY MIN STAFF REPORTING 2021-02-10
TAS01 JANUARY MIN STAFF REPORTING 2021-02-10
TAS01 JANUARY MIN STAFF REPORTING 2021-02-10
TAS02 FEBRUARY MIN STAFF REPORTING 2021-03-10
TAS02 FEBRUARY MIN STAFF REPORTING 2021-03-10
TAS02 FEBRUARY MIN STAFF REPORTING 2021-03-10
TAS03 MARCH MIN STAFF REPORTING 2021-04-10
TAS03 MARCH MIN STAFF REPORTING 2021-04-10
TAS03 MARCH MIN STAFF REPORTING 2021-04-10
TAS04 APRIL MIN STAFF REPORTING 2021-05-10
TAS04 APRIL MIN STAFF REPORTING 2021-05-10
TAS04 APRIL MIN STAFF REPORTING 2021-05-10
TAS05 MAY MIN STAFF REPORTING 2021-06-10
TAS05 MAY MIN STAFF REPORTING 2021-06-10
TAS06 JUNE MIN STAFF REPORTING 2021-07-10
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-02-11 02-07-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-02-13 02-06-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-02-14 02-07-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-02-21 02-21-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-02-26 02-25-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-02-26 02-26-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-02-26 02-26-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-02-26 02-26-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-03 02-26-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-03 02-26-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-03 02-25-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-03-03 03-03-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-03 02-26-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-06 02-27-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-06 02-27-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-03-06 03-06-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-06 02-26-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-03-06 03-06-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-06 02-27-2025
SWM02 FEBRUARY SURFACE WATER MOR 2025-03-10 03-07-2025
SWM02 FEBRUARY SURFACE WATER MOR 2025-03-10 03-07-2025
MOR02 FEBRUARY PLANT/DIST MOR 2025-03-10 03-07-2025
TAS02 FEBRUARY MIN STAFF REPORTING 2025-03-10
MOR02 FEBRUARY PLANT/DIST MOR 2025-03-10 03-04-2025
MOR02 FEBRUARY PLANT/DIST MOR 2025-03-10 03-07-2025
TAS02 FEBRUARY MIN STAFF REPORTING 2025-03-10
TAS02 FEBRUARY MIN STAFF REPORTING 2025-03-10
TAS02 FEBRUARY MIN STAFF REPORTING 2025-03-10
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-11 03-05-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-11 03-05-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-11 03-04-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-14 03-07-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-14 03-07-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-03-20 03-20-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-03-20 03-20-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-03-25 03-25-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-25 03-21-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-25 03-21-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-28 03-21-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-03-28 03-28-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-03-28 03-21-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-03-28 03-26-2025
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-04-02 03-28-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-04-02 03-26-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-04-07 04-01-2025
LCRT01-SAMPLE LOADED TO SDWIS 2025-04-08 04-08-2025
MOR03 MARCH PLANT/DIST MOR 2025-04-10 04-08-2025
MOR03 MARCH PLANT/DIST MOR 2025-04-10 04-08-2025
MOR03 MARCH PLANT/DIST MOR 2025-04-10 04-07-2025
SWM03 MARCH SURFACE WATER MOR 2025-04-10 04-07-2025
SWM03 MARCH SURFACE WATER MOR 2025-04-10 04-08-2025
TAS03 MARCH MIN STAFF REPORTING 2025-04-10
TAS03 MARCH MIN STAFF REPORTING 2025-04-10
TAS03 MARCH MIN STAFF REPORTING 2025-04-10
TAS03 MARCH MIN STAFF REPORTING 2025-04-10
LCRT03-INDVIVDUAL TAP PB CN ISSUED 2 DAY 2025-04-11 04-03-2025
LCRT06-IND TAP VERIFY PB CN RECEIVED 2025-04-16 04-09-2025
SWM04 APRIL SURFACE WATER MOR 2025-05-10
TAS04 APRIL MIN STAFF REPORTING 2025-05-10
TAS04 APRIL MIN STAFF REPORTING 2025-05-10
MOR04 APRIL PLANT/DIST MOR 2025-05-10
SWM04 APRIL SURFACE WATER MOR 2025-05-10
TAS04 APRIL MIN STAFF REPORTING 2025-05-10
MOR04 APRIL PLANT/DIST MOR 2025-05-10
MOR04 APRIL PLANT/DIST MOR 2025-05-10
TAS04 APRIL MIN STAFF REPORTING 2025-05-10
MOR05 MAY PLANT/DIST MOR 2025-06-10
SWM05 MAY SURFACE WATER MOR 2025-06-10
SWM05 MAY SURFACE WATER MOR 2025-06-10
TAS05 MAY MIN STAFF REPORTING 2025-06-10
MOR05 MAY PLANT/DIST MOR 2025-06-10
MOR05 MAY PLANT/DIST MOR 2025-06-10
TAS05 MAY MIN STAFF REPORTING 2025-06-10
TAS05 MAY MIN STAFF REPORTING 2025-06-10
TAS05 MAY MIN STAFF REPORTING 2025-06-10
CCR1 CCR RECEIVED 2025-07-01
CCR2 CCR CERTIFICATION FORM RECEIVED 2025-07-01
TAS06 JUNE MIN STAFF REPORTING 2025-07-10
TAS06 JUNE MIN STAFF REPORTING 2025-07-10
TAS06 JUNE MIN STAFF REPORTING 2025-07-10
TAS06 JUNE MIN STAFF REPORTING 2025-07-10
SWM06 JUNE SURFACE WATER MOR 2025-07-10
MOR06 JUNE PLANT/DIST MOR 2025-07-10
MOR06 JUNE PLANT/DIST MOR 2025-07-10
MOR06 JUNE PLANT/DIST MOR 2025-07-10
SWM06 JUNE SURFACE WATER MOR 2025-07-10
TAS07 JULY MIN STAFF REPORTING 2025-08-10
TAS07 JULY MIN STAFF REPORTING 2025-08-10
MOR07 JULY PLANT/DIST MOR 2025-08-10
MOR07 JULY PLANT/DIST MOR 2025-08-10
MOR07 JULY PLANT/DIST MOR 2025-08-10
SWM07 JULY SURFACE WATER MOR 2025-08-10
SWM07 JULY SURFACE WATER MOR 2025-08-10
TAS07 JULY MIN STAFF REPORTING 2025-08-10
TAS07 JULY MIN STAFF REPORTING 2025-08-10
TAS08 AUGUST MIN STAFF REPORTING 2025-09-10
TAS08 AUGUST MIN STAFF REPORTING 2025-09-10
SWM08 AUGUST SURFACE WATER MOR 2025-09-10
SWM08 AUGUST SURFACE WATER MOR 2025-09-10
MOR08 AUGUST PLANT/DIST MOR 2025-09-10
MOR08 AUGUST PLANT/DIST MOR 2025-09-10
MOR08 AUGUST PLANT/DIST MOR 2025-09-10
TAS08 AUGUST MIN STAFF REPORTING 2025-09-10
TAS08 AUGUST MIN STAFF REPORTING 2025-09-10
CCR3 CCR PRIORITY REVIEW 2025-09-30
SWM09 SEPTEMBER SURFACE WATER MOR 2025-10-10
MOR09 SEPTEMBER PLANT/DIST MOR 2025-10-10
MOR09 SEPTEMBER PLANT/DIST MOR 2025-10-10
TAS09 SEPTEMBER MIN STAFF REPORTING 2025-10-10
TAS09 SEPTEMBER MIN STAFF REPORTING 2025-10-10
TAS09 SEPTEMBER MIN STAFF REPORTING 2025-10-10
MOR09 SEPTEMBER PLANT/DIST MOR 2025-10-10
SWM09 SEPTEMBER SURFACE WATER MOR 2025-10-10
TAS09 SEPTEMBER MIN STAFF REPORTING 2025-10-10
SWM10 OCTOBER SURFACE WATER MOR 2025-11-10
SWM10 OCTOBER SURFACE WATER MOR 2025-11-10
TAS10 OCTOBER MIN STAFF REPORTING 2025-11-10
TAS10 OCTOBER MIN STAFF REPORTING 2025-11-10
TAS10 OCTOBER MIN STAFF REPORTING 2025-11-10
TAS10 OCTOBER MIN STAFF REPORTING 2025-11-10
MOR10 OCTOBER PLANT/DIST MOR 2025-11-10
MOR10 OCTOBER PLANT/DIST MOR 2025-11-10
MOR10 OCTOBER PLANT/DIST MOR 2025-11-10
TAS11 NOVEMBER MIN STAFF REPORTING 2025-12-10
SWM11 NOVEMBER SURFACE WATER MOR 2025-12-10
MOR11 NOVEMBER PLANT/DIST MOR 2025-12-10
MOR11 NOVEMBER PLANT/DIST MOR 2025-12-10
MOR11 NOVEMBER PLANT/DIST MOR 2025-12-10
TAS11 NOVEMBER MIN STAFF REPORTING 2025-12-10
TAS11 NOVEMBER MIN STAFF REPORTING 2025-12-10
TAS11 NOVEMBER MIN STAFF REPORTING 2025-12-10
SWM11 NOVEMBER SURFACE WATER MOR 2025-12-10
SWM12 DECEMBER SURFACE WATER MOR 2026-01-10
SWM12 DECEMBER SURFACE WATER MOR 2026-01-10
TAS12 DECEMBER MIN STAFF REPORTING 2026-01-10
TAS12 DECEMBER MIN STAFF REPORTING 2026-01-10
MOR12 DECEMBER PLANT/DIST MOR 2026-01-10
TAS12 DECEMBER MIN STAFF REPORTING 2026-01-10
MOR12 DECEMBER PLANT/DIST MOR 2026-01-10
MOR12 DECEMBER PLANT/DIST MOR 2026-01-10
TAS12 DECEMBER MIN STAFF REPORTING 2026-01-10
CCR3 CCR PRIORITY REVIEW 07-24-2018
LCRM01A-SMPS RECEIVED 02-21-2017
HAB03 DEFICIENCY LETTER DATE
HAB04 ACCEPTANCE LETTER DATE 04-14-2016
LCRM03-REVIEW COMPLETED 02-22-2017
SWAP012-PROTECTION PLAN ENDORSEMENT 12-29-2017
SWAP012-PROTECTION PLAN ENDORSEMENT 05-31-2016
SWAP012-PROTECTION PLAN ENDORSEMENT 12-26-1996
SWAP007-PWS ASSESSMENT ENDORSEMENT 12-26-1996
Total Number of Compliance Schedules Displayed = 169

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Apr 11 04:20:47 EDT 2025